Scheduling::
SCT
- Fygir Advanced Scheduling
STAG - SOS scheduling
Reduce Lead Times
Reduce Inventory
Increase Utilization
Improve Efficiency
Optimize the Bottleneck
Be in Control
Scheduling has been described as the most cost effective tool to control
and optimize the throughput in any manufacturing plant. Based around
the theories espoused in Goldratt's book, 'The Goal', scheduling seeks
to optimize the throughput of the bottleneck or constraint. The argument
is that if this is kept at maximum efficiency, the entire plant will
be optimized. It has been proved correct many times. Absolute Admin
have had considerable experience with these packages having concentrated
efforts in installations over several years in this area.
Planning::
SCT - Fygir Advanced Planning
Plan from forecasts
Smoothes peaks and troughs of demand
Prepare forecasts for scheduling
Assists Critical Path Analysis
Plans utilizations over wide time frames
Assists decision making for investment
Planning is preparing the business for the future. Scheduling ensures
that the short range batch creation is at its optimum and assists in
handling short term fluctuations in demand. Planning takes a broader
view based around long term contracts and forecasts of sales. It can
show where capacity deficiencies and surpluses occur and spreads the
load and having a smoothing effect. Some of these packages are very
expensive to buy. Absolute Admin can also provide solutions to these
issues using databases and spreadsheets.